Global projects

Where casino and resort development is under way

A regional tracker of integrated resort construction, casino renovation, entertainment districts and hospitality expansion, maintained as clearly marked sample editorial profiles.

Integrated casino resort tower under construction beside a waterfront at dusk

Geographic view

Five regions on the tracker

Select a region to filter the project profiles below.

Waterfront Australian casino resort and hotel exterior at blue hour

Oceania

Approvals

Harbour Entertainment Precinct — Stage Two

Integrated resort expansion · Australia, east coast

A sample editorial profile of a second-stage waterfront expansion in which gaming area is held broadly constant while entertainment, accommodation and public space carry the growth.

Planned components
Gaming floor reconfiguration · Hotel tower · Theatre · Public realm
Timeline
Approvals under way; staged delivery
Integrated casino resort tower under construction beside a waterfront at dusk

Asia-Pacific

Construction

Delta Integrated Resort

New integrated resort · South-East Asia

Sample profile of a greenfield resort designed around convention demand, with gaming positioned as one revenue stream among several rather than the anchor.

Planned components
Casino floor · Convention centre · Two hotels · Retail gallery
Timeline
Structure topped out; fit-out to follow
Premium casino gaming salon interior with custom lighting and patterned carpet

Europe

Fit-out

Old Quarter Casino Renovation

Heritage venue renovation · Southern Europe

Sample profile of a heritage-listed venue where surveillance coverage, accessibility and services had to be introduced without altering protected fabric.

Planned components
Heritage facade retention · New gaming salons · Restaurant
Timeline
Fit-out in progress; phased reopening
Rows of new slot cabinets on a modern casino gaming floor at dusk

North America

Construction

Lakeside Casino Floor Modernisation

Floor modernisation · Midwest United States

Sample profile of a modernisation delivered zone by zone while the property continues to trade, prioritising infrastructure that lowers the cost of future change.

Planned components
Raised access floor · Zoned lighting · New bank layout · Dining
Timeline
Trading throughout; zone-by-zone delivery
Integrated resort lobby and dining area adjoining a gaming venue

Middle East

Concept

Gulf Entertainment District

Entertainment district masterplan · Gulf region

Sample profile of a masterplanned district in which any gaming component remains contingent on the regulatory framework that is ultimately adopted.

Planned components
Hospitality · Arena · Retail · Gaming subject to framework
Timeline
Concept stage; scope subject to policy settings
Roulette wheel and baccarat layout in an empty casino salon before opening

Asia-Pacific

Operating

Island Resort Gaming Salon Refresh

Premium salon refurbishment · Pacific islands

Sample profile of a compact premium salon programme focused on acoustic isolation, service density and equipment specified for quiet operation.

Planned components
Premium tables · Acoustic separation · Private dining
Timeline
Completed; performance under review

Development stages

How a casino project moves from concept to operation

  1. Stage 1

    Concept

    Masterplanning, feasibility and scope definition.

  2. Stage 2

    Approvals

    Planning, licensing and community conditions negotiated.

  3. Stage 3

    Construction

    Structure, services and fire engineering delivered.

  4. Stage 4

    Fit-out

    Interiors, gaming systems, surveillance and commissioning.

  5. Stage 5

    Operating

    Trading, with performance under continuing review.

Project reporting

From the projects desk

Editorial demo content. Bravencora sample reporting is written to illustrate industry practice and is not presented as verified news about named companies, projects or legislation.